Previous |
Previous |
After exiting the tunnel, we went and checked out the mouth topside. The entire area was restructured some time ago to improve traffic conditions for the bridge built in place of the tunnel. (Which was closed because of the flooding, caused by the Lachine canal above the tunnel.)
|